Skip to content
ARKLINE

ARKLINE / DEVELOPMENT JOURNAL

Building the ship.
Keeping the story.

Progress is more than a new screenshot. These are the decisions, discoveries and unfinished questions behind Arkline, recorded as the work takes shape.

NEWEST FIRST

Each note names its development checkpoint. Prototype footage and published development source are separate from the released game.

From the workshop

GIF previews play here. Use Pause GIF for one capture, or Pause animations for all. Reduced-motion preferences show stills.

  1. Latest journal entry
    Earlier actual-engine split view of a mining drone approaching Pioneer’s ore receiver, published with the 25 October journal entry.
    Play GIF Pause GIF · show still Capture details · motion paused Earlier capture · 25 October ore receiver
    Earlier actual-engine ore-receiver excerpt from the 25 October journal, reused for context rather than as current stability proof. Earlier actual-engine split view of a mining drone approaching Pioneer’s ore receiver, published with the 25 October journal entry.

    Earlier footage: 10.2 seconds at normal speed from the recorded ore journey, using renderer c6f03b0 and authority 11325b7. It does not show the new controls or measure their responsiveness. Open original GIF. Open still.

    Local prototypePioneer / bay stability

    A steadier single bay

    Pioneer’s local bay controls are easier to follow, a long startup stall is shorter, and the development work is being brought together without losing the earlier progress.

    Read the development note 3 min read
  2. Earlier journal entry
    Actual engine split view of the same mining drone approaching Pioneer’s ore receiver, with transfer state shown below.
    Play GIF Pause GIF · show still Capture details · motion paused Ore receiver · normal-speed excerpt
    The same mining drone approaches the ore receiver in two actual engine views during a normal-speed ten-second excerpt. Actual engine split view of the same mining drone approaching Pioneer’s ore receiver, with transfer state shown below.

    10.2 seconds from 1:50–2:00.2 of the recorded journey, at normal speed. The loop restarts; it is not the full journey or a frame-rate benchmark. Open original GIF. Open still.

    Local prototypePioneer / drones and cargo

    From the drone bay to the cargo hold

    Deploy a mining class, bring ore back without parking the drone, then recall the fleet through a shared physical bay. This pass connects the machinery to the cargo ledger and the controls.

    Read the development note 5 min read
  3. Earlier journal entry
  4. Earlier journal entry
  5. Earlier journal entry
  6. Earlier journal entry